A look at rebuilding the East-West Strainmeter



Setting monument and bellows pier forms (Nov 02).

Pulling the weight (July 02).

Surveying the casing (July 02).

Grout frame setup (July 02).

Grout frame feet forms (July 02).

Bud and Steve in discussion (July 02).

Drill bit centralizers (May 02).

Drilling (May 02).

Drilling Hole #3 (first drilled). Note laser pointers used to align drill rig and transit (May 02).

Back to PFO home page